Sequence of Work in Building Construction

The sequence of work to be followed in the construction of a building is the at most important procedures of construction. The major...

Types of Drawings used in Building Construction

Different types of drawings is used in construction such as architectural drawings, structural, electrical, plumbing and finishing...

Different Types of Building Plans

Building plans are the set of drawings which consists of floor plan, site plan, cross sections, elevations, electrical, plumbing and...

Procedure on Plastering of Masonry Surfaces

Fig 1: Plastering work Plaster is a thin layer of mortar applied over the masonry surface and it acts as a damp-proof coat over the brick...

Types of Cracks in Concrete Columns and their Causes

Four types of cracks developed in reinforced concrete column are diagonal cracks, horizontal cracks, splitting cracks, corrosion cracks....

How to Construct Concrete Slab

Concrete floor slab construction process includes erection of formwork, placement of reinforcement, pouring, compacting and finishing...

Types of Construction Contracts and Their Comparison

There are different types of construction contracts and their comparison is presented in this article. A construction contract is an...

How to Construct Concrete Stairs?

Construction of concrete stairs includes steps such as designing, preparing foundation, building formwork, placement of reinforcement...

Guides for Formwork (Shuttering)

Formwork (shuttering) in concrete construction is used as a mould for a structure in which fresh concrete is poured only to harden...